<?xml version="1.0" encoding="utf-8"?>
<rss version="2.0">
    <channel>
        <title>Miller Creek Road</title>
        <link>http://wgmgroup.com/miller_creek_road/</link>
        <description></description>
        <language>en</language>
        <copyright>Copyright 2008</copyright>
        <lastBuildDate>Mon, 14 Apr 2008 10:05:38 -0700</lastBuildDate>
        <generator>http://www.sixapart.com/movabletype/</generator>
        <docs>http://www.rssboard.org/rss-specification</docs>
        
        <item>
            <title>Design and Right-of-Way Acquisition Underway</title>
            <description><![CDATA[<p class="MsoNormal" style="MARGIN: 0in 0in 0pt"><font size="3"><font color="#000000"><font style="FONT-SIZE: 0.8em"><span style="FONT-FAMILY: Arial">The City of </span><st1:City><st1:place><span style="FONT-FAMILY: Arial">Missoula</span></st1:place></st1:City><span style="FONT-FAMILY: Arial"> has contracted with WGM Group, Inc. for design&nbsp;and&nbsp;engineering services for&nbsp;the&nbsp;Miller Creek Road Improvements project. &nbsp;Additionally, the City has contracted with DJ&amp;A&nbsp;to complete property appraisals and right-of-way acquisition. <span style="mso-spacerun: yes">&nbsp;</span>You will see activity on the road as our&nbsp;crews collect survey data, map utilities, and stake right-of-way lines.<o:p></o:p></span></font></font></font></p>]]></description>
            <link>http://wgmgroup.com/miller_creek_road/2008/04/design-and-rightofway-acquisit.html</link>
            <guid>http://wgmgroup.com/miller_creek_road/2008/04/design-and-rightofway-acquisit.html</guid>
            
                <category domain="http://www.sixapart.com/ns/types#category">City of Missoula</category>
            
                <category domain="http://www.sixapart.com/ns/types#category">Missoula County</category>
            
            
            <pubDate>Mon, 14 Apr 2008 10:05:38 -0700</pubDate>
        </item>
        
        <item>
            <title>Miller Creek Road Improvements (Briggs St. to Mockingbird Way)</title>
            <description><![CDATA[<p>The City of Missoula plans to reconstruct Miller Creek Road from Briggs Street to Mockingbird Way, and approximately 500 feet west of the wye on Lower Miller Creek Road. The design includes sidewalks, boulevards, landscaping, curb and gutter, bike lanes, new pavement, and intersection improvements at Briggs and at the wye. The intersection improvements at the wye include a modern roundabout. Assuming a seven-month process for right-of-way acquisition, the project could be ready to bid in the fall of 2008, with a likely construction start in spring of 2009.</p>]]></description>
            <link>http://wgmgroup.com/miller_creek_road/2008/03/this-is-a-test-entry.html</link>
            <guid>http://wgmgroup.com/miller_creek_road/2008/03/this-is-a-test-entry.html</guid>
            
                <category domain="http://www.sixapart.com/ns/types#category">City of Missoula</category>
            
                <category domain="http://www.sixapart.com/ns/types#category">Missoula County</category>
            
            
            <pubDate>Fri, 07 Mar 2008 16:29:41 -0700</pubDate>
        </item>
        
    </channel>
</rss>
